Seminar Details

Type: In Person

Estimated Time: 1 Hour

Assets: Certificate of Attendance, Seminar Slides, Recordings post-seminar

Static Inverter’s & Central Battery System’s.

Summary
Most service related issues with a CBS System relates to the battery, and in most cases the highest cost in component replacement.  In this Seminar we will discuss the failure mechanisms  of the battery and when using the innovative BACS System, we can reduce the effects and maximise the deign life and capacity of the battery. We will also introduce the components and features of the BACS System.
What you will learn:
  • System Choice
  • Load Considerations
  • Battery Considerations
  • INRUSH
  • Single Point Failure
  • Sub-Circuit Monitoring
  • Cabling requirements
  • Commissioning
  • Maintenance
  • Battery Monitoring
  • Ventilux Range
Meet Your Facilitator
Ian Murphy
Ian Murphy is the R&D Manager for Ventilux Ltd and a recognised expert in power electronics. He started working for Ventilux in 1998, and in his capacity of R & D Manager is responsible for all facets of engineering design, product development and manufacturing.